Planning and Scheduling Business Processes under Control-Flow Uncertainty

arXiv cs.AI 2026-09-10 04:00 English

摘要

arXiv:2609.05578v1 Announce Type: new Abstract: Scheduling activities in business processes can improve efficiency (e.g., reduce makespan), but is challenging because the exact sequence of activities required to complete a case is often uncertain due to decisions based on data that emerges during execution. Nevertheless, probabilistic information regarding such decisions can often be estimated or derived from historical execution logs, and can help anticipate which execution paths are likely to lead to successful completion. Planning with particular execution paths affects feasibility, i.e., the probability of successful completion, and the expected number of superfluous activities that are planned but never executed. We frame the problem as a chance-constrained optimization problem and present two formulations: A decomposed approach with two stages, a planning stage that minimizes the expected number of superfluous activities subject to a feasibility constraint, and a scheduling stage that minimizes the makespan over the planned activities; and an integrated approach that combines planning and scheduling into a single formulation. Evaluation on two real-world and one synthetic dataset shows that the integrated approach yields superior makespans but is intractable at scale, while the decomposed approach scales to large settings.

阅读原文(arXiv cs.AI)→

本站为资讯聚合平台,仅展示标题与摘要,原文版权归原发布方所有;如有侵权请联系我们删除。